Unlock Human Potential

Decode Healthspan with Bio-sensors, comprehensive labs and Concierge

Decode Healthspan with
Bio-sensors, comprehensive labs and Concierge

Outsmart
aging.

Fuel your
evolution.

Performance Rebuilt.

Performance
Rebuilt.

Our App

An app to connect the dots

Discover how powerful smart features turn every workout into lasting progress.

Discover how powerful smart features turn every workout into lasting progress.

How it works

One daily performance
stack to support :


  • Build muscle efficiently: Complete EAAs deliver all nine essentials with 4 g leucine to drive muscle protein synthesis.

  • Train harder, longer: Creatine peptide replenishes ATP for stronger, faster, higher‑volume sets.

  • Recover faster: 3 g HMB cuts muscle breakdown and soreness for quicker bounce‑back.

  • Gain lean strength: EAAs plus creatine improve lean mass by up to 1.4 kg and boost strength gains.

  • Support metabolism and longevity: More muscle enhances glucose control and healthy protein turnover.

How Benfits Compound

Our Numbers

Time to give your muscles new life with high‑performance nutrition powered by AMINO9, our precise spectrum of essential amino acids with B‑HMB and creatine peptide. Built to trigger muscle protein synthesis, reduce breakdown, and power every session.​

Time to give your muscles new life with high‑performance nutrition powered by AMINO9, our precise spectrum of essential amino acids with B‑HMB and creatine peptide. Built to trigger muscle protein synthesis, reduce breakdown, and power every session.​

0

+

Years of research

EAA biology, HMB, and creatine have been investigated for decades across sports and healthy‑aging science.​

0

+

Human clinical trials

Randomized trials across the core ingredients demonstrate increases in muscle protein synthesis, strength, and lean mass.​

0

+

Peer‑reviewed studies

Extensive literature—systematic reviews and position stands—supports efficacy and safety across training and aging populations.​

0

g

EAA per serving

A complete EAA matrix enriched with 4 g leucine, paired with 3 g B‑HMB and 1 g creatine peptide for comprehensive support.

+

30

Years of research

EAA biology, HMB, and creatine have been investigated for decades across sports and healthy‑aging science.​

+

100

Human clinical trials

Randomized trials across the core ingredients demonstrate increases in muscle protein synthesis, strength, and lean mass.​

+

500

Peer‑reviewed studies

Extensive literature—systematic reviews and position stands—supports efficacy and safety across training and aging populations.​

g

12.25

EAA per serving

A complete EAA matrix enriched with 4 g leucine, paired with 3 g B‑HMB and 3 g creatine peptide for comprehensive support.

clinically proven benefits

Renewal

Recovery

Energy

Bioavailability

Creatine with resistance training consistently increases upper/lower‑body strength and adds ~0.9–1.4 kg lean mass over weeks.​

See Study Details

clinically proven benefits

Renewal

Recovery

Energy

Bioavailability

Creatine with resistance training consistently increases upper/lower‑body strength and adds ~0.9–1.4 kg lean mass over weeks.​

See Study Details

clinically proven benefits

Renewal

Recovery

Energy

Bioavailability

Creatine with resistance training consistently increases upper/lower‑body strength and adds ~0.9–1.4 kg lean mass over weeks.​

See Study Details

Compare us to

Mediocre BCAA

Supplements

AMINO 9 vs Mediocre BCAA

Amino 9

Mediocre BCAA

Gold Standard Clinical Trials

Performance-grade dosing

Strength outcomes

Anti-catabolic support

Unknown

Rapid bioavailablity

Unknown

Label transparency

Unknown

Purity/quality

Compare us to

Mediocre BCAA

Supplements

AMINO 9 vs Mediocre BCAA

Amino 9

Other

Uriolithin A

Gold Standard Clinical Trials

Performance-grade dosing

Strength outcomes

Anti-catabolic support

Unknown

Rapid bioavailablity

Unknown

Label transparency

Unknown

Purity/quality

Compare us to

Mediocre BCAA

Supplements

AMINO 9 vs Mediocre BCAA

Gold Standard Clinical Trials

Performance-grade dosing

Strength outcomes

Anti-catabolic support

Rapid bioavailablity

Label transparency

Purity/quality

Amino 9

Mediocre BCAA

Unknown

Unkown

Unkown

Amino in action

Your cells feel the benefit before you do.

Discover how powerful smart features turn every workout into lasting progress.

Hour 08

Complete Muscle Fuel : Free-form EAAs enter circulation, activating mTOR and fueling new muscle protein formation. Complete amino availability supports efficient turnover, setting the foundation for strong, resilient performance and longevity.

Day 02

MPS Activation : Peri‑workout EAA dosing boosts muscle fractional synthesis and outperforms BCAAs alone. Consistent activation preserves lean tissue, maintaining functional strength, metabolic rate, and long-term resistance to age-related decline.

Day 30

Anti‑Catabolic Shift : HMB reduces muscle breakdown while creatine raises energy capacity. Together they protect lean mass, enhance recovery, and reinforce metabolic health—vital for lifelong strength and training consistency.

Day 60

Strength Momentum : Cumulative EAA and creatine benefits yield measurable strength, lean mass, and performance improvements. Adaptations build resilience, establishing a self-sustaining upward curve in recovery, readiness, and lifespan potential.

Day 120

Structural Remodeling : Months of balanced anabolism reshape body composition, boosting muscle density, metabolism, and insulin sensitivity. Each added kilogram of lean mass compounds protective effects for lasting vitality and endurance.

Day 365

Peak Performance : Lifestyle Sustained EAA intake, training, and recovery unify into lasting habits. Strength and metabolism stabilize at higher baselines, balancing anabolism with cellular maintenance for extended healthspan.

Hour 08

Complete Muscle Fuel : Free-form EAAs enter circulation, activating mTOR and fueling new muscle protein formation. Complete amino availability supports efficient turnover, setting the foundation for strong, resilient performance and longevity.

Day 02

MPS Activation : Peri‑workout EAA dosing boosts muscle fractional synthesis and outperforms BCAAs alone. Consistent activation preserves lean tissue, maintaining functional strength, metabolic rate, and long-term resistance to age-related decline.

Day 30

Anti‑Catabolic Shift : HMB reduces muscle breakdown while creatine raises energy capacity. Together they protect lean mass, enhance recovery, and reinforce metabolic health—vital for lifelong strength and training consistency.

Day 60

Strength Momentum : Cumulative EAA and creatine benefits yield measurable strength, lean mass, and performance improvements. Adaptations build resilience, establishing a self-sustaining upward curve in recovery, readiness, and lifespan potential.

Day 120

Structural Remodeling : Months of balanced anabolism reshape body composition, boosting muscle density, metabolism, and insulin sensitivity. Each added kilogram of lean mass compounds protective effects for lasting vitality and endurance.

Day 365

Peak Performance : Lifestyle Sustained EAA intake, training, and recovery unify into lasting habits. Strength and metabolism stabilize at higher baselines, balancing anabolism with cellular maintenance for extended healthspan.

Hour 08
Day 02
Day 30
Day 60
Day 120
Day 365

Hour 08

Complete Muscle Fuel : Free-form EAAs enter circulation, activating mTOR and fueling new muscle protein formation. Complete amino availability supports efficient turnover, setting the foundation for strong, resilient performance and longevity.

Day 02

MPS Activation : Peri‑workout EAA dosing boosts muscle fractional synthesis and outperforms BCAAs alone. Consistent activation preserves lean tissue, maintaining functional strength, metabolic rate, and long-term resistance to age-related decline.

Day 30

Anti‑Catabolic Shift : HMB reduces muscle breakdown while creatine raises energy capacity. Together they protect lean mass, enhance recovery, and reinforce metabolic health—vital for lifelong strength and training consistency.

Day 60

Strength Momentum : Cumulative EAA and creatine benefits yield measurable strength, lean mass, and performance improvements. Adaptations build resilience, establishing a self-sustaining upward curve in recovery, readiness, and lifespan potential.

Day 120

Structural Remodeling : Months of balanced anabolism reshape body composition, boosting muscle density, metabolism, and insulin sensitivity. Each added kilogram of lean mass compounds protective effects for lasting vitality and endurance.

Day 365

Peak Performance : Lifestyle Sustained EAA intake, training, and recovery unify into lasting habits. Strength and metabolism stabilize at higher baselines, balancing anabolism with cellular maintenance for extended healthspan.

Mix one sachet in

250-300ml cold water.

For a spritz, add soda water.

Now available in three bold flavors 

Bright, tangy, and slightly sweet.

Lemon Zest

Bright, tangy, and slightly sweet.

Lemon Zest

Bright citrus with ruby‑orange zest.

Blood Orange

Bright citrus with ruby‑orange zest.

Blood Orange

Our Ingredients

The Science of Cellular Reconstruction

A precise matrix of 12.25g EAAs, 3g HMB, and 1g Creatine designed to override age-related anabolic resistance.

  • Leucine triggers muscle growth by activating the mTORC1 pathway, maximizing muscle protein synthesis at the 3-4g threshold, especially in older adults, leading to up to 145% MPS increase with training.

    Leucine

    Leucine is the biological trigger for muscle growth. It doesn't just build muscle; it flips the switch that tells your body to start building.

  • As a potent leucine metabolite, HMB prevents muscle breakdown by inhibiting the ubiquitin-proteasome pathway and stabilizing cell membranes, boosting protein synthesis by 20% and strength in aging populations.

    Beta-Hydroxy-Beta-Methylbutyrate (HMB)

    HMB is the "armored vest" for your lean mass. It is a metabolite of Leucine that is 20x more potent at preventing muscle breakdown (proteolysis).

  • This soluble form replenishes ATP via phosphocreatine, buffers fatigue, and enhances power output, muscle volume, and cognitive speed for peak physical and mental performance.

    Creatine Peptide

    Creatine is the fuel for explosive power and cognitive sharpness. The peptide form improves solubility and absorption dynamics.

  • Leucine initiates muscle growth, but the full EAA spectrum—including 2g Isoleucine for insulin-independent glucose uptake, 2g Valine to delay central fatigue by blocking tryptophan, 1.5g Lysine and 1g Threonine for collagen supporting tendons and ligaments, plus Histidine, Methionine, Phenylalanine, and Tryptophan—ensures sustained tissue repair and complete protein synthesis without bottlenecks.

    Essential Amino Acids (EAAs)

    Leucine starts the car, but the other EAAs keep it running. Amino9 provides the full spectrum required for sustained tissue repair.

"This soluble form replenishes ATP via phosphocreatine, buffers fatigue, and enhances power output, muscle volume, and cognitive speed for peak physical and mental performance."

Creatine Peptide

Creatine is the fuel for explosive power and cognitive sharpness. The peptide form improves solubility and absorption dynamics.

"Leucine triggers muscle growth by activating the mTORC1 pathway, maximizing muscle protein synthesis at the 3-4g threshold, especially in older adults, leading to up to 145% MPS increase with training."

Leucine

Leucine is the biological trigger for muscle growth. It doesn't just build muscle; it flips the switch that tells your body to start building.

"Leucine initiates muscle growth, but the full EAA spectrum—including 2g Isoleucine for insulin-independent glucose uptake, 2g Valine to delay central fatigue by blocking tryptophan, 1.5g Lysine and 1g Threonine for collagen supporting tendons and ligaments, plus Histidine, Methionine, Phenylalanine, and Tryptophan—ensures sustained tissue repair and complete protein synthesis without bottlenecks."

Essential Amino Acids (EAAs)

Leucine starts the car, but the other EAAs keep it running. Amino9 provides the full spectrum required for sustained tissue repair.

"As a potent leucine metabolite, HMB prevents muscle breakdown by inhibiting the ubiquitin-proteasome pathway and stabilizing cell membranes, boosting protein synthesis by 20% and strength in aging populations."

Beta-Hydroxy-Beta-Methylbutyrate (HMB)

HMB is the "armored vest" for your lean mass. It is a metabolite of Leucine that is 20x more potent at preventing muscle breakdown (proteolysis).

"Leucine triggers muscle growth by activating the mTORC1 pathway, maximizing muscle protein synthesis at the 3-4g threshold, especially in older adults, leading to up to 145% MPS increase with training."

Leucine

Leucine is the biological trigger for muscle growth. It doesn't just build muscle; it flips the switch that tells your body to start building.

"As a potent leucine metabolite, HMB prevents muscle breakdown by inhibiting the ubiquitin-proteasome pathway and stabilizing cell membranes, boosting protein synthesis by 20% and strength in aging populations."

Beta-Hydroxy-Beta-Methylbutyrate (HMB)

HMB is the "armored vest" for your lean mass. It is a metabolite of Leucine that is 20x more potent at preventing muscle breakdown (proteolysis).

"This soluble form replenishes ATP via phosphocreatine, buffers fatigue, and enhances power output, muscle volume, and cognitive speed for peak physical and mental performance."

Creatine Peptide

Creatine is the fuel for explosive power and cognitive sharpness. The peptide form improves solubility and absorption dynamics.

"Leucine initiates muscle growth, but the full EAA spectrum—including 2g Isoleucine for insulin-independent glucose uptake, 2g Valine to delay central fatigue by blocking tryptophan, 1.5g Lysine and 1g Threonine for collagen supporting tendons and ligaments, plus Histidine, Methionine, Phenylalanine, and Tryptophan—ensures sustained tissue repair and complete protein synthesis without bottlenecks."

Essential Amino Acids (EAAs)

Leucine starts the car, but the other EAAs keep it running. Amino9 provides the full spectrum required for sustained tissue repair.

Supplement Facts

An app to
connect the dots

An app to
connect the dots

Process

How it Works

Follow these three steps to achieve smarter, data-driven results effortlessly.

Step 1

Test your whole body

Get a comprehensive blood draw at one of our 2,000+ partner labs or from the comfort of your own home.

Step 2

An actionable plan

Easy to understand results and a clear health plan with tailored recommendations on diet, lifestyle changes & supplements.

Step 3

A connected ecosystem

You can book additional diagnostics, buy curated supplements with members-only discounts in your Cyborg OS dashboard.

Step 1

Test your whole body

Get a comprehensive blood draw at one of our 2,000+ partner labs or from the comfort of your own home.

Step 2

An actionable plan

Easy to understand results and a clear health plan with tailored recommendations on diet, lifestyle changes & supplements.

Step 3

A connected ecosystem

You can book additional diagnostics, buy curated supplements with members-only discounts in your Superpower dashboard.

Decode Health SuperIntelligence with CYBORG BIOS

Decode Health SuperIntelligence with CYBORG BIOS

Decode Health SuperIntelligence with CYBORG BIOS

An adaptive, AI‑driven supplement stack that reads your metabolic signals to deliver precise anabolic and energetic support. It fine‑tunes recovery windows with Amino9 so muscles rebuild faster, focusing on breaking performance plateaus and keeping you competition‑ready every day.

10k+ users improved their endurance

Needs

We guide you to what you need

After your health plan

Prescriptions

Medication & peptides you can buy from us,

at discounted prices.

Supplements

Curated supplements & health products, cheaper than Amazon.

Add-on Testing

Further advanced testing across gut health, cancer risk & toxins.

Answers 24/7

Ask follow-up questions about yourhealth to our care team.

Supplements

Curated supplements and health products,

cheaper than Amazon.

Add-on Testing

Further advanced testing across gut health,

cancer risk and toxins.

Answers 24/7

Ask follow-up questions about your

health to our care team.

  • Rigorously tested and made from high-quality ingredients

  • We believe that it's our responsibility to take the extra steps necessary to ensure that our products are safe and effective, and we are committed to upholding these high standards for all of our dietary supplements.

  • Placebo Controlled Clinical Studies

  • FDA GRAS

  • NSF for Sports

  • FSSC 22000

  • SMETA

  • SEDEX

  • Food Grade

  • ISO 14001 certification

  • ISO 45001 certification

Start Your Journey Today

Personalized training plans, expert guidance, and accountability at a price you’ll love.

Real Athletes. Real Results.

Real Athletes. Real Results.

Track your power. Feel the difference. Every scoop of AMINO9 fuels performance — backed by science and lived by athletes.

Track your power. Feel the difference. Every scoop of AMINO9 fuels performance — backed by science and lived by athletes.

Renée Mantel

Runner

“Endurance was always my biggest challenge. Since I started with AMINO9, I recover faster between training blocks and feel sharper on every swim, ride, and run.”

Kim

Hyrox Athlete

“The combination of amino acids and creatine peptides completely changed my recovery. I can train harder and bounce back quicker — this formula truly delivers.”

Ferry

Conditoning Coach

"My athletes require peak metabolic efficiency to sustain high-level output. AMINO9 optimizes their cellular recovery, ensuring they maintain power and focus through the final whistle."

Alec Smith

Elite Triathlete

"The precision of this blend is unmatched for long-distance endurance. I feel a massive difference in my leg fatigue during climbs and my mental clarity stays sharp for the entire ride."

Frequently Asked Questions.

Question not answered?
contact us at

What is AMINO9?

AMINO9 is a complete essential amino acid formula (12.25 g EAAs per serving) enriched with 4 g leucine and paired with 3 g HMB and 3 g creatine peptide to drive muscle protein synthesis, reduce muscle breakdown, and boost training output. Evidence shows EAAs stimulate MPS, HMB reduces proteolysis, and creatine increases strength and lean mass when combined with resistance training.​​

How is AMINO9 different from BCAAs?

Leucine flips the mTOR “on” switch, but BCAAs alone cannot sustain synthesis without the other six EAAs. Complete EAA blends raise MPS and whole‑body anabolism in humans; BCAA‑only formulas do not produce a meaningful increase.​​

When should I take it?

For training days, use 1 serving within 60 minutes pre‑ or post‑workout. On rest days, dose with a protein‑containing meal or during long inter‑meal gaps to support net anabolism. Leucine‑enriched EAA blends stimulate MPS even at modest doses in older adults; timing around training enhances the effect.​​

Can I take AMINO9 with whey or meals?

Yes. Pairing with dietary protein adds substrate and can further support synthesis; AMINO9 fills EAA gaps and optimizes the leucine trigger around workouts. If total daily protein is low or meals are spaced far apart, AMINO9 helps maintain a positive protein balance.​

Why include HMB (3 g)?

HMB complements EAAs by attenuating muscle protein breakdown and supporting strength and function—especially during high‑stress training blocks or energy deficits. Typical effective dose is 3 g/day.​

Why include creatine peptide (3 g)?

Creatine increases phosphocreatine stores, improving set quality, total training volume, and lean mass gains. Daily dosing is effective; timing is flexible.​

How long before I notice results?

Performance: Many users see better set endurance in 1–2 weeks with creatine saturation. Recovery/soreness: Often within the first few sessions when amino timing is consistent. Body‑comp/strength: Meaningful changes typically appear over 4–8 weeks of structured training.​

Is it safe? Any side effects?

Ingredients are well studied at labeled doses. Creatine may cause transient water retention; hydrate as usual. If you have kidney disease or take medications, consult your clinician before use.​

Can women and older adults use AMINO9?

Yes. EAAs support muscle maintenance across ages; creatine and HMB show benefits for strength and function in older adults as well. Adjust total protein intake to goals.​

Does it replace protein?

No. Think of AMINO9 as precision support to trigger and sustain MPS around training and long gaps; it complements, not replaces, a protein‑sufficient diet.​

How does AMINO9 help in a calorie deficit?

EAAs preserve lean mass, HMB reduces proteolysis, and creatine maintains training output—together helping you keep strength while cutting.​

What about electrolytes, caffeine, or pre‑workouts?

Compatible. If using stimulants, keep AMINO9 timing consistent; creatine can be taken anytime daily. Add electrolytes for hot sessions or long training blocks.​

What is AMINO9?

AMINO9 is a complete essential amino acid formula (12.25 g EAAs per serving) enriched with 4 g leucine and paired with 3 g HMB and 3 g creatine peptide to drive muscle protein synthesis, reduce muscle breakdown, and boost training output. Evidence shows EAAs stimulate MPS, HMB reduces proteolysis, and creatine increases strength and lean mass when combined with resistance training.​​

How is AMINO9 different from BCAAs?

Leucine flips the mTOR “on” switch, but BCAAs alone cannot sustain synthesis without the other six EAAs. Complete EAA blends raise MPS and whole‑body anabolism in humans; BCAA‑only formulas do not produce a meaningful increase.​​

When should I take it?

For training days, use 1 serving within 60 minutes pre‑ or post‑workout. On rest days, dose with a protein‑containing meal or during long inter‑meal gaps to support net anabolism. Leucine‑enriched EAA blends stimulate MPS even at modest doses in older adults; timing around training enhances the effect.​​

Can I take AMINO9 with whey or meals?

Yes. Pairing with dietary protein adds substrate and can further support synthesis; AMINO9 fills EAA gaps and optimizes the leucine trigger around workouts. If total daily protein is low or meals are spaced far apart, AMINO9 helps maintain a positive protein balance.​

Why include HMB (3 g)?

HMB complements EAAs by attenuating muscle protein breakdown and supporting strength and function—especially during high‑stress training blocks or energy deficits. Typical effective dose is 3 g/day.​

Why include creatine peptide (3 g)?

Creatine increases phosphocreatine stores, improving set quality, total training volume, and lean mass gains. Daily dosing is effective; timing is flexible.​

How long before I notice results?

Performance: Many users see better set endurance in 1–2 weeks with creatine saturation. Recovery/soreness: Often within the first few sessions when amino timing is consistent. Body‑comp/strength: Meaningful changes typically appear over 4–8 weeks of structured training.​

Is it safe? Any side effects?

Ingredients are well studied at labeled doses. Creatine may cause transient water retention; hydrate as usual. If you have kidney disease or take medications, consult your clinician before use.​

Can women and older adults use AMINO9?

Yes. EAAs support muscle maintenance across ages; creatine and HMB show benefits for strength and function in older adults as well. Adjust total protein intake to goals.​

Does it replace protein?

No. Think of AMINO9 as precision support to trigger and sustain MPS around training and long gaps; it complements, not replaces, a protein‑sufficient diet.​

How does AMINO9 help in a calorie deficit?

EAAs preserve lean mass, HMB reduces proteolysis, and creatine maintains training output—together helping you keep strength while cutting.​

What about electrolytes, caffeine, or pre‑workouts?

Compatible. If using stimulants, keep AMINO9 timing consistent; creatine can be taken anytime daily. Add electrolytes for hot sessions or long training blocks.​

Question not answered?
contact us at